Skip to content
McClain Bros.
All services

Bathroom & Kitchen Remodeling in Bucks County, MontCo & Philadelphia

A bathroom or kitchen remodel done by a plumbing contractor is a different animal from one done around a plumber. The drains, vents, supply lines and fixture positions are decided first, by the people who will install them, and the tile, cabinetry and finish follow from a layout that works. That is the difference between a room that looks new and a room that is new.

What that covers

What a call includes

  • Full bathroom remodels — demolition, rough-in, waterproofing, tile, fixtures, finish
  • Kitchen plumbing and finish: sink relocation, disposals, dishwasher lines, pot fillers, ice makers
  • Tub-to-shower conversions and accessible bathrooms
  • Fixture upgrades that keep the layout: vanity, toilet, faucet, shower valve
  • Custom tile for showers, floors, backsplashes and feature walls
  • Layout changes that move drains and supply, with the framing and venting to support them
  • Consultation, design, a written scope, and a walkthrough before and after

What people describe

  • A bathroom that has not been touched since the house was built, and shows it
  • A tub nobody uses, in a house where a walk-in shower would be used every day
  • Grout and caulk that fail every year because the waterproofing behind them was never right
  • A shower valve that runs hot and cold with every flush elsewhere in the house
  • A kitchen sink in the wrong place for how the room is actually used
  • A previous remodel that looks fine and drains badly
  • A rough-in that was moved without the vent moving with it

How a visit goes

  1. 01

    Consultation

    A visit to see the room, the floor below it and the access, to hear what you want and what you do not, and to talk through the budget honestly. No drawings are needed at this stage; photographs of rooms you like help more.

  2. 02

    Design and scope

    Layout, fixture selections, tile and material choices, worked into a written scope with the plumbing, electrical and finish work spelled out. What moves and what stays is decided here, because that is what decides the cost.

  3. 03

    The work

    Demolition with the house protected and the debris hauled; rough-in plumbing and any electrical, inspected; waterproofing done properly before a single tile; then tile, fixtures and finish. One crew for the trades means the plumber and the electrician are never waiting on each other.

  4. 04

    Walkthrough

    Every fixture run, every drain checked, every line of grout sealed, and the room cleaned to a standard you could use that night. Then a walkthrough with you, and nothing is finished until you say it is.

When it is an emergency, call

Remodels are planned, but the reasons for them sometimes are not. If a bathroom has become urgent, that is a plumbing call today and a remodel conversation afterwards.

  • Water coming through a ceiling under a bathroom
  • A shower or tub valve that will not shut off
  • A toilet flange or floor that has failed and left the toilet loose
(215) 788-0803— 24 hours

Questions people ask

Can a tub be converted to a walk-in shower?
Almost always. The drain usually needs to move toward the center of the new shower, the walls need waterproofing and tile, and a proper shower valve goes in. It is one of the most common remodels, and the right moment to add a bench, grab bars or a curbless entry if anyone in the house will want them.
Do I need to move the plumbing to get the layout I want?
Sometimes, and it is the single biggest cost variable. Moving a toilet means moving a large drain and its vent; moving a sink is easier. In a slab house, moving a drain means cutting concrete. A good design keeps the expensive fixtures where they are unless moving them genuinely changes the room.
What is waterproofing, and why does it matter more than the tile?
Tile and grout are not waterproof; the membrane behind them is. A shower that fails in a few years almost always failed there — at the pan, the corners or the niche — not at the tile. It is the part you never see, and the part that decides whether the room lasts.
How long does a bathroom remodel take?
A full remodel that keeps the layout typically runs a few weeks from demolition to walkthrough; moving fixtures, or waiting on custom tile or a special-order vanity, extends that. The written scope carries a schedule, and what most often stretches it is a change made after the tile has been ordered.
Do you handle the permits and inspections?
Yes, where the work requires them — moving plumbing, adding electrical, structural changes. Inspections are part of the schedule, and the paperwork is part of what you get at the end.

Remodeling by town

The same crew in every one of these — and a page on what remodeling work looks like in each town's houses. Distances are straight-line from our Levittown yard.

(215) 788-0803Contact